You can specify if pipes, junctions or fittings that do not have any cost calculated should be included in the Cost Report in the Output Control. Open Output Control from the Analysis menu and click on the Format & Action tab. In the Cost Report Formatting area, check or clear the Don’t Show Object With Zero Costs option.