Limit Pipe & Junction Label Movement

You can specify that pipe or junction labels can only be moved on the Workspace when the Shift key is pressed. Sometimes the labels get in the way of selecting the pipes of junctions themselves and are moved accidentally. You can change this to use the Shift key in the Allowable Workspace label movements are in Workspace Preference (on the Options menu).
  1078 Hits
  0 Comments
Applied Flow Technology

Possible Causes for Not Getting Costs in the Cost Report

There are several reasons why costs are not being calculated or shown in the Cost Report. If you are having trouble, please go through this checklist which may help pinpoint the problem. 1) Is “Calculate Costs” set in the Cost Settings from the Analysis menu? 2) Is a cost type (e.g. Material, etc.) selected in the Cost Definition area of the Cost Settings? 3) Is a cost database connected through the Database Manager and is the correct database section selected? 4) Does the cost database have the correct information for the object? You can verify the contents of a cost database...
Continue reading
  1093 Hits
  0 Comments
Applied Flow Technology

Changing the Order of Magnitude Displayed in the Cost Report

If you are displaying very large numbers in the Cost Report, you can change the order of magnitude scale that is displayed to reduce the number of digits shown. For example, you can specify that the table show millions of US Dollars (or what ever monetary unit you are using) and all the cost values will be divided by 10^6. This setting is shown in the upper left corner of the table, just below the monetary units used. To set the magnitude, open the Output Control from the Analysis menu and click on the Format & Action tab. In the Cost...
Continue reading
Tags:
  1059 Hits
  0 Comments
Applied Flow Technology

Changing Input Values to Obtain a GSC Solution

If GSC is unable to find a solution, try changing the specified input value of the variable(s) to provide the solver a different starting point.
  990 Hits
  0 Comments
Applied Flow Technology

Hiding/Showing Items With Zero Costs in the Cost Report

You can specify if pipes, junctions or fittings that do not have any cost calculated should be included in the Cost Report in the Output Control. Open Output Control from the Analysis menu and click on the Format & Action tab. In the Cost Report Formatting area, check or clear the Don’t Show Object With Zero Costs option.
Tags:
  1044 Hits
  0 Comments
Applied Flow Technology

Generating a Pump/System Curve for a Selected Time Step

System and Pump vs System curves always reflect the conditions at the first time step. To graph curves at a different time step, run the simulation to the time step of interest, then create a disconnected scenario from the View menu. Load this new scenario and use it to generate the system / pump vs system curve.
Tags:
  1160 Hits
  0 Comments
Applied Flow Technology

Keyboard Shortcuts

Selection Drawing Tool Double-clicking tool - Tool remains activeControl key - Tool remains active above +Shift key - Deselects pipes and junctionsAlt key - Toggles pipe and junction selection Pipe Drawing Tool Double-clicking tool - Tool remains activeControl key - Tool remains activeShift key - Draws horizontal or vertical pipes Zoom Select Tool Shift key - Zoom state will always be 100%. Dragging junctions from Toolbox Control key - Morphs junctionShift key - Splits pipe Inspecting pipes and junctions Right click + Shift key - Shows undefined itemsControl key - Shows Output dataAlt key - Shows optimized data (AFT Mercury only)Control...